Toll Free: +1 888-870-3005 410-625-0808 1611 Bush Street, Baltimore, MD 21230, USA sales@dredge.com

Day

September 11, 2014
DOMINICAN REPUBLIC – Historically, mining processes with poor recovery rates have resulted in tailings with significant amounts of recoverable material. The extraction of this material can be achieved using dredges. There are several factors that justify the extraction and re-processing of tailings: Tailings require fewer resources when compared to conventional mining. For example, a dredge can – in a single step – extract and transport the material to a processing plant located even kilometers away. This reduces costs related to capital equipment, labor, fuel and maintenance. Advances in re-processing technology Processing of tailing allows for additional production without increasing a...
Continue Reading
DOMINICAN REPUBLIC – Historically, mining processes with poor recovery rates have resulted in tailings with significant amounts of recoverable material. The extraction of this material can be achieved using dredges. There are several factors that justify the extraction and re-processing of tailings: Tailings require fewer resources when compared to conventional mining. For example, a dredge can – in a single step – extract and transport the material to a processing plant located elven kilometers away. This reduces costs related to capital equipment, labor, fuel, and maintenance. Advances in re-processing technology Processing of tailing allows for additional production without increasing a...
Continue Reading